Planning phase of construction phases
Planning phase is also known as pre-construction
stage and we can understand it by following steps
Objective establishment
The first step is setting of objective or defining
the objective, the important point during fixing the objective is that the
objective should be achievable and also under the policy of corporate or
organization.
Identification of project activities
This is 2nd step where all the
activities will be displayed those are required to complete & achieve the
objective during identification of activities one point should be considered
that each and every activity should be result oriented .for example survey of
site and layout.
Determination of Sequence of objectives
In this step project in charge has to decide the
correct sequence of activities i.e. which activity will be followed by which
activity. The sequence of activities should be such a way that it can be able
to achieve the objective of project in minimum time.
There should not be any
confusion regarding the sequence of activities because it can destroy the
project.
Determination of duration of activities
In this step the project in charge will calculate
the normal duration of each activity.
There may be some variation in time to complete each
activity but by calculating & mentioning the normal duration for each
activity will provide the states of project at any time.
Perform schedule calculation
When project in charge decided the duration for each
activity, then he will be able to calculate the duration of various activity
path or sequence.
Critical path- the longest path through the network, it provides the information about the duration of the project.
Float or slack- the shortest path through the network
Critical path- the longest path through the network, it provides the information about the duration of the project.
Float or slack- the shortest path through the network
Revise and Adjust
On the basis of previous point result, project in
charge can understand that what possible changes may be required to complete
the project in time.
Monitoring & controlling
These scheduling & planning are the base to
understand the project need and other required information like it will give us
the information that when work will be started.
It should be noted that in actual case the work or
duration to complete may vary or may be beyond our decided time duration, so in
this point project in charge will control & arrange to complete that tasks
as per decided time period.
Special requirement
Project in charge will decide that if there is any
such activity that requires some particular instrument or device .he will
mention in this column and also mention duration and quantities.
Safety
Project in charge will ensure that all the safety
devices and instruments are available on site for example safety belt, helmet
shoes and gloves (if required).
Spare plan
Project in charge will ensure that all the required
materials & spares are available at sites, so that work will not be stopped
due to the non availability of material.
Availabilities of utilities
Project in charge will ensure that from where he
will arrange water electricity and compressed gas.
Theses all documents are required to be approved by
planning authority.
Design phase
Introduction
- Aim of this phase is to clarify the requirement of design for the project.
- In this stage the project in charge wishes to compress the schedule
- It needs the update version of CAD
People
- Any project is useless until unless it is designed by considering cost factor, safety factor and time factor. This point should be understood by project in charge and other person involved in project
- Stack holders should be under consideration and up to date, so that as design progresses the parties those are interested may be involved at suitable stage.
- There should be good relation between companies and involved team so that project may run at each stage without any interruption and complete at given time.
- There should be a single design team with expertise in all field and they should be able to involve all the concern people at respective stage.
- The design should be such that there will be minimum requirement of review of design.
- All team should be supported by a good communication system.
- Every team member should be known about their rolls & responsibilities.
- Team member should be well trained about that project so that the efficiency can provide the best project.
Project Scope
- In this stage the project in charge can evaluate that which area is fully defined and there will be no risk and it can proceed with good efficiency.
- The extent of design should be defined clearly from starting, because some parts of design are usually left by project member on contractor.
- Involvement of contractor and supplier with project team should be as soon as possible because it will avoid the confusion in future.
- One important thing should be remembered during the design of project that every part of project should be understood by contractor with the help of project in charge, usually some difficult part of design is left on contractor and contractor struggle with that part, this will reduce the efficiency of the project team and delayed the project.
Over design
If some important information is absent, the project
in charge will decide the maximum expected value e.g. weight of system,
stiffness of member, deflection of member.
Design process
In design process there should be planning of design
sequence and there will be need of some information as listed below.
- Drawing
- Design information
- Design information
- Documents
- Materials
- Instruments
- Equipment's
- Manpower
Project in charge should have all information about
the specification of devices and material used in project. Review of design should be in deep. If there is lack of information then involved expert
person to assume that data. Selection of design option should be such that it
will complete the project in minimum time.
Freeze the design
- Freeze only that part of design, which is accepted as constraints on the remaining part of design
- Reduce the number of processing time and step
Strategy
- Consider the factor of re-use
- Simplicity should be over there
- There should be no repetition
- Consider the factor of modularization
- Consider the factor of pre-assembly and pre –fabrication
- Use standard design tools
Project management and procedure
- Project control
- Design approval
- Design verification
- Communication
- Change control
Cost and risk consideration
Consider the entire factor related to cost and risk.
Coordination of Planning and design phase
Planning and design phase are coordinated as if it
is so, it can reduce the project life cycle and project cost. In planning phase
as stated in task 1 is the key phase in project and design phase depends on
this phase.
Without planning phase the project will not run
smoothly and on the basis of planning project in charge may know that how he
will design the project by consideration of all factors in planning stages.
Construction of house
Following factors we should consider during the
planning of construction of house
Planning
- Identification of basic structural properties of building construction material
- Identification of hazards associated with the construction material
- Identify the factor of fire and effect of fire on building materials like wood, cast iron, steel, Reinforced Concrete, Gypsum wallboard, glasses, plaster and lath
- Identify the factor of building collapsing condition
- Identify the terms as Fire wall, Cantilever wall/unsupported wall, Party wall, Veneer wall, Partition wall and load bearing
- Building material should be fire resistance, Non-combustible and with Heavy Timber
Design of house
There are some factors that should be considered
during the design of house
- Preparation of layout
- Cleaning of layout
- Construction method used
- Choice of technology used
- Levelling of area
- Removal trees
- Calculating the required ratio of mixtures
- Installing sewer lines and other utilities
- Pouring concrete
- Provision of water and electricity
- Provision of fresh air and sun light
- Provision of road to manufacturing plant
- Provision of road to school
- Provision for pet animals
- Provision for garden
- Provision for swimming pools
- Provision for playing park
- Provision for club
- Provision for library
- Provision of temple and church
Bill of quantities
We can generate bill of quantity by
- Calculating cost for each activity
- Calculating time for each activity
- Calculating of manpower and working time
- Calculating the cost of other resources
- Calculating of cost of luxury items
The roles and responsibilities of all parties involved in the planning and design phases for project
Roles and responsibilities of planner
- Objective establishment
- Identification of project activities
- Determination of Sequence of objectives
- Determination of duration of activities
- Perform schedule calculation
- Function of Revise and Adjust
- Monitoring & controlling
- Identification of Special requirement
- Identification of Safety
- Identification of Spare plan
- Identification of Availability of utilities
Roles and responsibilities of design professional
- Preparation of drawings and specifications
- Preparation of check list
- Secure DSA approval of drawing and specification
- Trained the working professional about the objective of project
- Submit the contract copy
- Submit the inspector qualification and experience copy
- Observe the construction activities during the construction
- Identification of any sudden changes
The
roles and responsibilities of all parties involved in the production phases for
project
Roles and responsibilities of Project inspector
Rolls of project inspector is to investigate all
activity and specification and standard operating procedure.
Roles and responsibilities of Construction manager
- Construction manager will co-ordinate with work men and contractor to supervise the project work so that project will run smoothly and if there will be any obstruction, he will clarify and find the solution, if he is not able to do he will inform to project in charge.
- Construction manager will arrange the material from concerned resources.
- He will coordinate with various departments such as mechanical, electrical, planning department, designing department & quality control.
- He will make a report of daily activities to compare with planned activity.
Roles and responsibilities of Contractor
- Contractor will supervise and manage their worker
- Contractor will follow the assembly procedure and design procedure as given by design team.
The corporate and personal responsibilities of all parties involved in construction for projects
Corporate responsibilities
To take care of health and safety of all man and
material involved.
To arrange training time to time
To arrange seminar
To arrange facilities of entertainment
To arrange the food and logistic
Personal responsibilities
To use all personal protective equipment
To follow the guidelines given by safety manager
To complete the task with safety
To inform the superior of any uncertainties
So, I hope we have understood each phases and
responsibilities in details