EXPERIENCE SUMMARY
More than 50 (Fifty) Years (1965 - 2016) of
Experience in Cement and other related Industry covering more than 100
assignments in cement plants with capacities ranging from 100 tpd to 10,000 tpd
in India and abroad involving visit to 25 countries overseas in connection with
work
PROFESSIONAL QUALIFICATIONS AND TRAINING
Bachelor of Electrical Engineering, 1965, Jadavpur
University (1st Class Honors)
Worked overseas in Electrical and Process Technology
Department, Holtec, Canada
-
Completed Cement Course in Technical Center Holderbank, Switzerland.
-
Completed Computer Training Course in I.I.T., Kanpur.
Completed course on “PERT/CPM” conducted by Datamatics
Corporation, Calcutta
-
Attended course on “Leadership” conducted by XLRI, Jamshedpur.
“Marketing Management” - Datamatics Corporation,
Calcutta
-
Attended course on “Finance for non-Finance executives”
-
Authored articles in Indian Cement Review and Technical Magazines.
-
Attended NCBM International Seminars in New Delhi
- Chaired
Seminar on Blended Cement in Kolkata
-
Imparted training to young Engineers
AREAS OF WORK
Market Survey, Technology and Project Development
comprising Feasibility Study, Capital Cost estimation and Financial Analysis.
Negotiations with Financial Institutes and Banks for
approval of loan viz. IDBI, IFCI, NEDFI, World Bank, ADB and NDB of Sri Lanka
Detail Design & Engineering comprising
Procurement, Technology selection, layout and flow sheet preparation,
interaction with vendors and review of vendor’s drawings and documents
Site Supervision of Construction, Erection,
Commissioning and Trouble shooting.
Recruitment and Training of Personnel
Augmenting plant capacity by incorporation of modern
technology
Improving Plant Productivity through systematic
review and appropriate modification in the existing facilities leading to cost
optimization
Due Diligence Study of Cement plants for acquisition
by industrial groups
ASSIGNMENT SUMMARY
Nature of
assignment
|
Number of
assignments
completed
|
Site Selection and Pre-feasibility studies
|
15
|
Bankable Techno Economic Feasibility Report
(TEFR)/Detailed Project Report (DPR)
|
25
|
Basic Engineering and Procurement Assistance
|
50
|
Detailed Engineering
Mechanical and Electrical/Instrumentation
Site Supervision and Management
|
65
10
|
Project Monitoring
|
5
|
Productivity Enhancement and Operational
Management Studies
|
25
|
Management Services including Due Diligence for
preparation of revival/rehabilitation scheme
|
10
|
CHALLENGING ASSIGNMENTS IN CAREER (ORGANIZATION)
Execution of complete instrumentation and control
system in a dry process cement plant in Mysore Cements Ltd., Ammasandra (AVB)
Complete project management of a 1200 tpd 1st
dry process plant (Only 2-support kiln with planetary kiln in India) from
concept to commissioning in Madras Cements Ltd. (HOLTEC)
Complete project management of a 1.7 mtpy slag
cement from concept to commissioning including site supervision, Dalla and
Chunar, UPSCC (HOLTEC)
Complete project management of a 1350 tpd 1st
dry process plant from concept to commissioning including site supervision,
plant executed well within budget in Devapur, A.P. (Orient)
Erection and commissioning of a 75 tph boiler in a
record time of 6 months in Brajrajnagar, Odisha (Orient)
Complete site management of a 7,500tpd dry process
plant in Ras-el-Khaimah, UAE (TKII)
Technical Due Diligence Study of 10,000 tpd
integrated cement plant and 4 nos. cement grinding plants, each of capacity 800,000
tpy in Indonesia (ERCOM)
EMPLOYMENT RECORD (STARTING WITH THE LAST EMPLOYER)
Sr.
No
|
period
|
organisation
|
designation
|
job
responsibility
|
1.0
|
November
2013 till June 2016 – two years and 8
months
|
Mideast
Integrated Steels Ltd, Delhi (MESCO STEEL)
|
Technical
Adviser
|
Setting
up of cement plants in Odisha and Madhya Pradesh
and
Upgradation of Maithan Ispat – MESCO 2 – SMS & Rebar Mill and 600 tph
Iron Ore Crushing and Screening Plant
|
2.0
|
May
2014 till May 2015 – one year
|
BQB Infra Technorium Pvt.
Ltd.
|
Director
- Projects
|
Cement
Cooler in Lafarge Egypt
|
3.0
|
November
2008 till September 2013 – 5 years
|
ERCOM
Engineers Pvt. Ltd., Delhi - Premier Engineering Consulting Organization of
27 Years (ERCOM)
|
President
(Engineering)
|
Business
and Technology Development, Engineering and Management of Indian and Overseas
Projects.
|
4.0
|
April
2005 to
October
2008 – 3 and half years
|
ThyssenKrupp
Industries
India Private Limited, Pune – Large Machinery Manufacturing
Company
of 50 years (TKII)
|
Technical
Expert and Senior General Manager
|
Site-in-Charge
of 7500 tpd Cement plant in U.A.E. and a Turnkey Coal Handling Plant of 2 x
500 MW Thermal Power Plant of DVC in Andal, W.B. and miscellaneous other
assignments
|
5.0
|
November
1993
to march 2005 – 11 and half years
|
Development
Consultants Private Limited, Kolkata – Premier Engineering Consultancy
Organization of 50 Years (DCPL)
|
General
Manager-
Cement
Technology
|
Technology
Development and Management
Co-ordination of Assignments in Cement Division
|
6.0
|
November
1978 to October 1993 – 15 years
|
Orient
Cement, A division of Orient Paper and Industries Ltd, Kolkata – Birla Group Company
|
Manager
- Projects
|
Management
of Design Activities of Cement Division involving Engineering, Project
Management & Site Supervision
|
7.0
|
September
1969 to October 1978 – 9 years
|
Holtec
Engineers Pvt. Ltd., Delhi– Premier Consultancy Organization in Cement Industry (HOLTEC)
|
Deputy
Manager - Engineering
|
System
Design, Project Engineering and Site Supervision of cement plants
|
FOREIGN COUNTRIES VISITED DURING WORK IN PROJECTS
South Asia
|
Middle east
and Africa
|
Europe and
north America
|
Bangladesh, Bhutan, China, Indonesia, Singapore,
Sri Lanka, Thailand
|
Chad, Iran, Kenya, Malawi, Mauritius, Sudan,
Tanzania, United Arab Emirates, Yemen
|
Canada,
Denmark, England, Germany, Holland, Italy, Sweden, Switzerland
|
EXPERIENCE OF WORKING WITH NATIONAL AND INTERNATIONAL CONSULTANTS AND FINANACIAL INSTITUTES
1.0
|
IDBI, IFCI, ICICI, NEDFI, IDFC, Standard chartered
private equity (Mauritius)
|
2.0
|
World bank and ADB in India and Bangladesh
|
3.0
|
National development bank in Srilanka
|
4.0
|
Arab bank in Dubai and Sudan
|
5.0
|
Price water house, e & y and kpmg
|
6.0
|
Deloitte touche in Mauritius
|
7.0
|
Standard chartered bank in Mumbai, Tanzania and Singapore
|
ADDRESS FOR COMMUNICATION
Flat No 1003, Tower 4
Malibu Towne, Sohna Road
Gurgaon, Haryana, India
Haryana – 122 002
Mobile: N/A
E-mail: subratabhaumik@rediffmail.com
DETAILED WORK EXPERIENCE IN VARIOUS COMPANIES
Assignments in AVB (September 1965 to august 1969)
Sr.
No.
|
Client
|
Work
description
|
1.0
|
Kalyanpur
Lime & Cement Works
|
Commissioning
of Clinker Cooler and associated equipment. for 850 TPD Wet Process Cement
Plant
|
2.0
|
Jamul
Cement Works (The Associated Cement Company, Mumbai.)
|
Erection
and Commissioning assistant to KHD Experts for 600 TPD Dry Process Plant.
|
3.0
|
Panyam
Cements & Minerals Industries Ltd.
|
Erection
& Commissioning work of 600 TPD Dry Process Cement Plant of KHD
|
4.0
|
Mysore
Cements Ltd.
|
Erection
& Commissioning of complete Instrumentation and Controls for KHD Plant
and Trouble Shooting for Dust Collectors, Electro- Filter, Fuller Cooler etc.
for 600 TPD Dry Process Plant.
|
5.0
|
Kesoram
Industries Ltd.
|
Erection
& Commissioning work of 600 TPD Dry Process Cement Plant of KHD
|
6.0
|
Wadi
Cements Ltd.
|
Erection
& Commissioning work of pneumatic controls of Fuller cooler, blending
silo and other equipment of 600 TPD Dry Process Cement Plant of KHD
|
Assignments in HOLTEC (September 1969 to October 1978)
Sr.
No.
|
Client
|
Work
description
|
1.0
|
Madras
Cements Ltd.
|
Preparation
of Detailed Project Report, Basic & Detailed Engineering for 1200 TPD Dry
Process Cement Plant
|
2.0
|
Kajrahat
Chunar Cement Project of capacity 5000 TPD Clinkerisation and split located
Slag Cement grinding plant of UP State Cement Corporation
|
Total
Project Management comprising preparation of DPR, Basic and detailed
engineering and site services
|
3.0
|
Century
Cements Ltd.
|
Preparation
of Study Report on Optimum Coal Quality of 2x1000 TPD Dry Process Plant
|
4.0
|
Shahabad
Cements.
|
Dust
Insufflation and Chain System, Design & Operation Study.
|
5.0
|
Mandhar
Cement Works.
|
Dust
Insufflation and Chain System, Design & Operation Study of 600 TPD Wet
Process Cement Plant
|
6.0
|
Kymore
Cement Works
|
Operation
of 750 TPD Calcinator Kiln and Production Optimising.
|
7.0
|
Mysore
Cements Ltd.
|
Operation
of 750 TPD Calcinator Kiln and Production Optimising of the cement plant
|
8.0
|
Kalyanpur
Lime & Cement Works
|
Design
of electrical and Centralised Control of Cement Mill Plant.
|
9.0
|
Paro
Cement Project
(Royal
Govt. of Bhutan)
|
Feasibility
Report for Setting up of a Cement Plant in Bhutan
|
Assignments in Orient cement (November 1978 to October 1993)
Sr.
No.
|
Company
|
Work
description
|
1.0
|
orient
cement (prop: orient paper and industries limited) – own project
|
Complete
project execution from preparation of project report, procurement activities,
design engineering of a 3500 tpd plant.
|
2.0
|
orient
cement (prop: orient paper and industries limited) – own project
|
site-in-charge 1350 tpd cement plant in
devapur, a.p. with machinery supplier larsen and toubro limited, involving
3,000 tonnes of structural fabrication and erection, 3,000 tonnes of
machinery, rotary kiln, clinker cooler,
instrumentation and control and pollution control equipment, starting
from limestone crusher to packing plant
|
3.0
|
orient
paper and industries limited
|
feasibility
study, site selection report, geological investigation, negotiation with
promoters for 0.5 mtpy integrated cement plant in meghalaya in joint venture
between midc and opil.
|
4.0
|
orient
paper and industries limited
|
feasibility
study and negotiation with upscc for acquisition of 2 mtpy slag cement plant
in chunar in joint venture between upscc and opil.
|
5.0
|
birla
technical services and birla engineering services
|
feasibility
report for 500,000 tpa cement plant for p.t.
semen cirebon, indonesia, gas based 600,000 tpa cement plant in
bangladesh. and plant upgradation report for cement plant in malawi,
feasibility study for cement plant in yemen.
|
6.0
|
cement
and allied products (bihar) limited
|
feasibility
study, site selection report, geological investigation, negotiation with
world bank etc. for 1 mtpy slag cement plant in bokaro in joint venture
between sail, bsidc and opil.
|
7.0
|
orient
paper and industries limited
|
Erection
and commissioning of a 75 tph fluidized bed boiler and a 7.5 mw tg set in
brajnagar, orient paper unit.
|
8.0
|
hyderabad
asbestos limited, guwahati
|
project
execution from preparation of project report, technology selection,
procurement activities and design engineering of a 150 tpd mini cement plant.
|
9.0
|
ariyalur
cement works, tamil nadu
|
plant
study and identification of plant operational problems in 1500 tpd dry
process plant
|
10.0
|
orient
engineers
|
Visit
of cement plants and techno-commercial negotiations of tenders for
establishment of esps, designed by research cottrell, selection of site for
setting up of the manufacturing unit and discussion with the plant designers
in London.
|
Assignments in DCPL (November 1993 to March 2005)
Sr. No
|
client
|
work description
|
1.0
|
My Home Cements
|
Engineering services for Upgradation of
both phases of the 3200 TPD Cement Plant at Nalgonda, A.P.
|
2.0
|
Saurashtra Cements Ltd.
|
Engineering services for cement projects
in Mauritius, Sri Lanka, Ghana and Zambia.
|
3.0
|
Lafarge India Ltd.
|
TEFR for 1 MTPA Fly Ash Cement Grinding
Plant at Jamshedpur, 1 MTPA Fly Ash Cement Grinding Plant at West Bengal at 3
locations and 2200 TPD Cement Plant in Meghalaya.
|
4.0
|
Zuari Cements Limited – Birla Group
company
|
Complete plant balancing study and Basic
Engineering of the expansion project from 1800 tpd to 5000 Dry Process Cement
Plant, comprising installation of Crushing Plant, Raw Mill, Precalciner,
Cooler, Coal Mill, Cement Grinding Mill, Packing & Despatch.
|
5.0
|
Rajashree Cement – Birla Group company
|
System design for ash handling, storage
and transport system for Rajashree Cement and detailed Design Engineering
services for the same.
|
6.0
|
Penden Cement Authority Limited
|
Engineering and plant optimization
Services for 1200 tpd cement plant expansion at Gomtu, Bhutan.
|
7.0
|
Orient
Cement - Birla Group company.
|
Engineering and plant optimization
Services for 3200 tpd plant at Devapur, A.P. and 1500-tpd cement grinding
plant
|
8.0
|
Shree Cement Limited
|
Complete
Project Management from Procurement Activities, Design Engineering and Site
Supervision of a 2500 TPD Plant for Shree Cement, a Bangur Group Company.
|
9.0
|
HM Cements Limited
|
Detailed Engineering services for 350 TPD
Cement Plant in Meghalaya
|
10.0
|
Purbanchal Cement Private Limited
|
Detailed Engineering services for 500 TPD
Cement Plant in Assam
|
11.0
|
Birla
White – Birla Group company
|
Engineering services for Upgradation of
both of the White Cement Plant at
Gotan, Rajasthan for Grasim Industries Limited
|
12.0
|
RCL Cement Limited
|
Detailed Engineering services for 2500 TPD
Cement Plant in Umrangshu, Assam
|
13.0
|
National Cement Company, Dubai
|
Preparation
of Techno-Economic Feasibility Report, Negotiations with Investors,
preparation of tender documents for plant and machinery and Engineering
Services for 4000 tpd cement plant in Sudan
|
14.0
|
Alsalam Cement Production Co., Sudan
|
Review
Engineering services for 2000 tpd cement plant in Sudan.
|
15.0
|
Swasata Cement Limited
|
TEFR and Detailed Engineering services for
1000 TPD Cement Plant in Purulia
|
16.0
|
Trumboo Industries Private Limited
|
TEFR and Detailed Engineering services for
1000 TPD Cement Plant in Srinagar
|
17.0
|
Union Cement Company (P.S.C.)
|
Review Engineering services for 10000 TPD
Cement Plant in U.A.E.
comprising complete Turnkey Tender Evaluation for a 10,000 tpd Cement project
in Ras-El-Khaimah, U.A.E., Techno-Commercial negotiations leading to signing
of the Contract between the Supplier, CBMEC (Sinoma Group), China and Union
Cement Company (P.S.C.) in presence of the Heidelberg Technical Center,
Germany.
|
18.0
|
DS Construction Limited, Delhi
|
Turnkey
Tender preparation for a 1 mtpy cement plant in Libya. The entire Tender was
prepared in England.
|
19.0
|
Cement Corporation of India Limited
|
Due Dilligence study of all running cement
plants in Akaltara, Neemuch, Charkhi Dadri, Bokajan etc.
|
20.0
|
J.K.Udaypur Udyog Industries Limited
|
Due Dilligence study of the cement plant
on behalf of ICICI, particularly to determine present market value.
|
21.0
|
Jalalabad Cement Company Limited,
Bangladesh
|
Preparation
of Techno-Economic Feasibility Report, Negotiations with Investors for 4000
tpd cement plant in Sylhet, Bangladesh
|
22.0
|
Beximco Limited, Bangladesh
|
Preparation
of Techno-Economic Feasibility Report, Negotiations with Investors for 4000
tpd cement plant in Sylhet, Bangladesh
|
23.0
|
Abul Khair Group, Bangladesh
|
Clinker
unloading system in 4000 tpd clinker grinding plant in Narayanganj, Dhaka
|
Assignments in TKII (April 2005 to October 2008)
S. No.
|
client
|
project description
|
1.0
|
Gulf Cement Company (P.S.C.),
Ras-Al-Khaimah, U.A.E.
|
Site-in-Charge of 7500 TPD Cement Plant in
Ras-Al-Khaimah, U.A.E. on behalf of turn key machinery supplier M/s
Thyssenkrupp Industries India, involving 14,000 tonnes of structural
fabrication and erection, including plate work. 9,000 tonnes of machinery
having largest vertical roller mill in the world of capacity 600 tph, 7,500
tpd rotary kiln, latest clinker cooler, state of the art instrumentation and
control and most sophisticated pollution control equipment, starting
from limestone stockpile to clinker silo.
|
2.0
|
India Cement Limited, Sankari Works, Tamil
Nadu
|
Optimization of plant operation of 1200
TPD Cement Plant in India Cement Limited involving closed circuit raw mill of capacity 90 tph, 1,200 tpd
rotary kiln with ILC, clinker cooler and 2 nos. coal mills of capacity 6.8
tph and 8.2 tph.
|
3.0
|
Damodar Valley Corporation – 2 x 500 MW
Themal Power Station – Coal Handling Plant, Durgapur, West Bengal
|
Site-in-Charge in Durgapur on behalf
of ThyssenKrupp Industries Pvt.Ltd., Turnkey
Contractor of Coal Handling Plant – Durgapur Steel TPS (2 x500 MW), located
in Andal, Pin – 713321, Dist.Burdwan, West Bengal, involving 6,000 tonnes of
structural fabrication and erection, including plate work. 6,000 tonnes of
machinery having wagon tippler, track hopper for wagon unloading, 4 nos. coal
crusher, 2 nos. stacker reclaimer and a network of belt conveyors involving a
total investment of Rs.430 Crores.
|
Assignments in ERCOM (November 2008 to September 2013)
S. No.
|
Client
|
project description
|
1.0
|
Grasim Industries Limited
|
TEFR for 2 x 3.3 MTPA Cement Plant of
capacity 10,000 tpd grey cement and 2 x 3,000 tpd white cement plant in Iran.
|
2.0
|
Raysut Cement Company, Oman
|
Study of investment opportunity in the
Gujarat region for a large capacity cement plant along with Adani Group.
|
3.0
|
STM Group, California
|
TEFR for 1000 tpd Integrated Cement Plant
in Chad, Africa.
|
4.0
|
Rudradev Cement Private Ltd., Guwahati
|
TEFR for 600 tpd Integrated Cement Plant
in Assam
|
5.0
|
Mangalam Cement Limited, Morak, Rajasthan
|
Upgradation study of Kiln of Unit I of
capacity 1800 tpd to 3000 tpd by additional equipment
|
6.0
|
Bagalkot Cement Limited, Bagalkot, Karnataka
|
Upgradation study and engineering of the
cement plant from capacity 1100 tpd to 1800 tpd by additional equipment
|
7.0
|
Shree Cement Limited, Bewar, Rajasthan
|
Fly Ash utilization study of all the
cement plants of capacity 24,000 tpd and installation of fly ash processing
unit
|
8.0
|
Ashoka Group
|
Consultancy assignment of a 600 tpd OWC
cement plant in Saudi Arabia
|
9.0
|
Khalari Cement Limited, Ranchi, Jharkhand
|
Upgradation study of the PPC cement
grinding plant PPC
|
10.0
|
J.K.Lakhsmi Cement Limited
|
Basic and Detailed Engineering consultancy
for 4,500 tpd integrated and split located cement plant in Durg, Orissa and
Bihar
|
11.0
|
Aditya Cement Shambupura
|
Detailed engineering of coal handling
plant by belt conveyors, crusher and vibrating screen
|
12.0
|
Mangalam cement
|
CAPEX of PBSP and Clinker silo and clinker
transport
|
13.0
|
Kesoram cement
|
CAPEX of PBSP and Clinker silo and clinker
transport
|
14.0
|
Ultratech cement, Tadipatri
|
Detailed engineering of coal handling
plant by belt conveyors
|
15.0
|
Ultratech cement, Tadipatri
|
CAPEX of hot air duct and cement transport
belt conveyor
|
16.0
|
Green Valley Industries Ltd.
|
TEFR for 1500 tpd Cement grinding plant in
Bihar
|
17.0
|
Vikram cement
|
CAPEX of gypsum and additive handling
system
|
18.0
|
Vikram cement
|
DPR for 6000 tpd Cement plant expansion
line IV
|
19.0
|
Surya Global Cement Ltd.
|
TEFR for 5 MTPA Cement plant in Gujarat
|
20.0
|
Gujarat cement works
|
CAPEX of coal stacker extension and
clinker transport and raw meal transport from C.F.Silo I to II
|
21.0
|
Narmada Cement Works
|
Engineering for Clinker silo and Clinker
transport system
|
22.0
|
Vasavadatta Cement
|
Engineering consultancy for 3 MTPA PPC
Cement grinding plant at Sholapur, Maharashtra
|
23.0
|
Taurian Iron and Steel Co.Pvt.Ltd.
|
Due Diligence Study of a 1200 tpd PPC
Cement plant in Tatanagar
|
24.0
|
Barak Valley Cement Ltd.
|
Technical Study of Pyro-section of a 1200
tpd PPC Cement plant in Assam
|
25.0
|
Ultratech cement Ltd. – Ginigera Works
|
CAPEX of coal handling system, coal
grinding and HAG for slag drying
|
26.0
|
Ultratech cement Ltd. – Narmada Cement,
Magdalla
|
Basic engineering and CAPEX of upgradation
of cement grinding system from 100 to 200 tph, after introduction of VRM.
|
27.0
|
Ultratech cement Ltd. – Awarpur
|
Process Audit of Pyro-section
|
28.0
|
Ultratech cement Ltd. – Tadipatri
|
Engineering of hot air duct system
|
29.0
|
Ultratech cement Ltd. – Tadipatri
|
Engineering of Wagon Tippler and material
handling system
|
30.0
|
Ultratech cement Ltd. – Vikram Cement
|
TEFR of Line I II and III, based on
audited balance sheet
|
31.0
|
Associated Cement Company Ltd.
|
Turnkey pre-bid services to Shapoorji
Pallonji and Techpro for six 2 mtpy cement plants
|
32.0
|
Ultratech cement Ltd. – Gujarat Cement
|
CAPEX of gypsum hopper extension
|
33.0
|
Ultratech cement Ltd. – Ginigera
|
Engineering of VRM for coal grinding and
HAG installation
|
34.0
|
Ultratech cement Ltd. – Awarpur
|
CAPEX of coal handling and screening in a
coal washery
|
35.0
|
Ultratech cement Ltd. – Awarpur
|
Basic Engineering and CAPEX of conversion
of ESP into RABH
|
36.0
|
Ultratech cement Ltd. – Kothputli
|
Engineering and CAPEX of Fly-ash
conveying from TPP to cement mill
|
37.0
|
Ultratech cement Ltd. – Kothputli
|
Engineering and CAPEX of Coal from TPP
to Plant reclaimer belt conveyor.
|
38.0
|
Ultratech cement Ltd. – Kothputli
|
Engineering and CAPEX of Coal fired Hot
Gas Generator Cement mill.
|
39.0
|
Ultratech cement Ltd. – Kothputli
|
Engineering and CAPEX of Limestone
transport to a storage and screening plant
|
40.0
|
Ultratech cement Ltd. – Magdalla
|
Clinker storage and handling
|
41.0
|
SKS Cement Ltd.
|
TEFR for 3 MTPA Cement plant in
Chhattisgarh
|
42.0
|
Andhra Cement Limited
|
Financial Due Diligence of Plant
Upgradation
|
43.0
|
Sandvik Asia Private Ltd.
|
VGCB
Coal Terminal – Recommendation on appropriate pollution control measure
|
44.0
|
Standard Chartered Private Equity
(Mauritus) Ltd.
|
Technical Due Diligence Study for assessment of
Cement Plant Project Status of capacity 6.93mtpy in Bhuj and Surat, Gujarat
and review of DPR for expansion project in Bhuj and Central India
|
45.0
|
Abhijit Cement Ltd.
|
TEFR for 6,000 MTPD Cement plant in Katni and 2 x
1.5 MTPA Cement grinding plant in Katni and Jharkhand
|
46.0
|
Ultratech Cement Ltd.
|
Fly Ash handling system in Cement mill 3 and 5
|
47.0
|
Birla White (Ultratech)
|
Project Monitoring Services for a Wall Care Putty
plant in Katni, M.P.
|
48.0
|
Green Concretex Cements Pvt. Ltd.
|
TEFR for 2,500 MTPD Clinkerization and 1250 TPD Cement
Grinding plant in Diphu Assam
|
49.0
|
Gujarat Cement Works
|
Bypass system of desulphurization in thermal power
plant
|
50.0
|
Ultratech Cement Ltd., Bhatinda
|
Fly Ash handling system by installation of SKS
Separator in Cement
|
51.0
|
Saraf Agencies, Kolkata
|
TEFR and Engineering for a 20,000 TPA Slag
Titanium Project in Odisha
|
52.0
|
MESCO Steels
|
TEFR for 2 MTPY Cement plant in Rewa, M.P and DPR
and Engineering for 0.5 MTPY Slag cement plant in Odisha
|
53.0
|
Navketan Mines
|
Technical Feasibility Study for utilization of Fly
Ash of a Thermal Power plant
|
54.0
|
Standard Chartered Private Equity
(Singapore) Ltd.
|
Technical Due Diligence Study for assessment of cement
plants in Indonesia 1) Integrated Cement Plant Project of capacity 3.67 mtpy in
Bayah, 2) 4 Grinding plants each of capacity 0.84 mtpy in Ciwanden,
Balikpapan, Medan and Dumai 3) and a running cement plant capacity 1,000 tpd
in Kupang
|
55.0
|
J.K.Lakhsmi Cement Ltd.
|
TEFR for cement grinding plant projects in 1) 1500
tpd in Surat, 2) 1500 tpd in Raniganj, WB 3) Due Diligence Study of a running
cement plant.
|
56.0
|
Ashapura Group, Bhuj
|
Pre-feasibility study of a mini-white plant in
Bhuj
|
57.0
|
J.V.L. Agro, Rohtas, Bihar
|
TEFR for cement grinding plant project of 2 x 1500
tpd PPC in Rohtas
|
58.0
|
J.K.Lakhsmi Cement Ltd.
|
DPR for 4500 tpd integrated cement plant at Durg,
Chhattisgarh
|
59.0
|
Mamba Cement Company Limited
|
TEFR for 1 mtpy cement plant in Tanzania
|
60.0
|
Saraf Agencies, Kolkata
|
Engineering for a 30,000 TPA Titanium Dioxide
Pigment Project in Odisha
|
61.0
|
Birla Corporation Limited
|
TEFR for 2 mtpy cement (6,000 tpd) plant at Satna,
M.P.
|
62.0
|
J.K.Lakhsmi Cement Ltd.
|
DPR for 1500 and 3000 tpd cement grinding plant at
Asansol and Bankura in West Bengal
|
63.0
|
IDBI Mumbai
|
Lender’s Independent Engineer – LIE for J.K.Cement
project in Mangalore and Jhajhar
|
64.0
|
J.K.Lakhsmi Cement Ltd.
|
DPR for Line I upgradation in Sirohi, Rajasthan
|
65.0
|
Lokapur Cements Pvt. Ltd.
|
TEFR for 1000 tpd cement plant at Lokapur,
Bagalkot, Karnataka
|
No comments:
Post a Comment